Sunday, February 25, 2018

Kitchen Cabinet amendment

One of the missing components the previous owners of this house never had, was heating ventilation into the laundry room. If you remember, this was the room annihilated by termites, and had to be completely rebuilt from the ground up. So while we were working on that, we cut a vent into the room and had our HVAC contractor run ductwork. Since the floor is concrete in that room, he ran it through the wall. With that wall being the back of the kitchen, I cut out the back of the cabinet to accept the ductwork and reinforced the floor with spare shelf wood. 

Like a glove.






No comments:

Post a Comment