The wooden ceiling begins

Been waiting for this since before I owned the house.


A three row repeating pattern. 


Looking good. Pictures of the final results to come very soon.


Let's build a wall and close in this room

The guy who was doing our ceiling foam insulation took FOREVER to show up, canceling three times before he finally showed up. Unfortunately, he waited just long enough to let the Inspector General go on vacation for twelve days. Not knowing we were going to have to wait, we had turned in our lease termination on the Beech Glen house. So that means we didn't have the option to just sit around and wait. I had wanted to wait until inspection to build the attic half-wall, but now it needed to be done. 



Some crazy angles and twisted turns, but it all worked out. Honestly, it's one of the most intensely satisfying things I've done on the house so far. 



Picking Paint

The Missus had a paint theme in mind, but there are still decisions to be made. Four samples from Sherwin Williams painted on a wall that will be hidden by wainscoting was the perfect way to see the colors in large swatches. 


Once a color was picked, she started in the laundry room with some coverup primer. She finished it with two coats of primer and a couple coats of paint all in two or three nights. 


Bathroom assembled

A couple weeks ago we borrowed our old friend Rusty for one last trip to Home Depot. 


But who needs a truck when you can strap plywood to the top of a Volkswagen. 


Almost done with the bathroom. Yep, it looks as good in person. 


Thursday, April 6, 2017

Small chores equal big advances

There are lots of small, menial tasks that lead up to big changes. Most of our next couple weeks' work will be those little jobs. Tonight the Missus stripped wallpaper in the bathroom in prep for painting tomorrow. 



I added a couple more pieces of drywall. One more trip to Home Depot and we should have everything on sight to finish the house.


I also added the nailer boards for the half wall that will block off the attic. Small but important jobs.


Sunday, April 2, 2017

In with the new, a piece of the old

We have to wait until Monday to give the Inspector a call, so today we spent some time plodding along with our list of tasks needed to move in. First up, a new mailbox. 


The other projects we filled the day with were centered around drywall. 

Whenever my Dad would work on a house or a kitchen, he would always leave something in a hidden location. It was usually his name and the date he did the work, but sometimes he would leave a note. When we starting working on the house I grew up in, he allowed me and my sisters to write notes on the drywall behind the brick hearth. And when I built kitchens with Dad, he allowed me to sign my own name on the cabinets I built and installed. It was a simple way to leave our mark on the world.

I've avoided talking about my Dad because this project has been emotional on more than one occasion. I carry a tape measure that bears the name of his Cabinet Factory etched into the face. His speed square is now mine and bears his initials, DES. I've used the finish hammer he had from before I have memories, and the red framing hammer he bought for me that matches the one he used for all my teenager years. His chisels, screwdrivers, nail guns, circular saw, table saw, utility knife, chalk line, and so many other tools have all done work on this house; not in his hands but in mine. 

Today my emotions bubbled to the surface. I was about to sign my name and the date on the back of a piece of drywall before I hung it, but then thoughts about my Dad starting flowing from my heart through the pen and ended up on the sheetrock. His old habit of leaving memories in the houses he worked on, had found it's way to a house I purchased five years after his death. Tears and more tears, and then more tears after that. It was long overdue. I miss you Dad. 


Saturday, April 1, 2017

Time for some Bathroom work

Why exactly did I put insulation in that interior wall you may ask? Furthermore, why is it thicker than normal wall insulation? Both good questions. The answer is a simple one... I like to use the facilities in peace and quiet, so I added some soundproofing to the bathroom. Yep, I went there. 



Our tile guy finished up the bathroom today as well. The Missus is beyond happy. The vaulted ceiling and wood ceiling is my favorite part of the house; the Bathroom is hers.