The guy who was doing our ceiling foam insulation took FOREVER to show up, canceling three times before he finally showed up. Unfortunately, he waited just long enough to let the Inspector General go on vacation for twelve days. Not knowing we were going to have to wait, we had turned in our lease termination on the Beech Glen house. So that means we didn't have the option to just sit around and wait. I had wanted to wait until inspection to build the attic half-wall, but now it needed to be done.
Some crazy angles and twisted turns, but it all worked out. Honestly, it's one of the most intensely satisfying things I've done on the house so far.